– Server 2003 – 2 physical NICs (first for cluster, second for LAN) – NLB installed – Both NICs cabled with CAT5 to the network
Month: January 2011
Seizing FSMO rolls
The five FSMO roles are: Schema master – Forest-wide and one per forest. Domain naming master – Forest-wide and one per forest. RID master –